Monday, November 3, 2008

Sperm Leaving The Viginia

New Site Association commuters

From now on the Bologna-Portsmouth Commuters Association has a forum and a blog entirely dedicated
.

http://pendolaribolognaportomaggiore.blogspot.com/
http://it.groups.yahoo.com/group/pendolaribolognaportomaggiore/

Here you will find all the information on
Association, the meetings with authorities , and everything that concerns
line. The president of


Fabio Businaro

Thursday, October 30, 2008

I-catcher Console Web View

ASSOCIATION MEETING - REGION ER - FER

E 'was convened for 12 November, a meeting between Emilia-Romagna Region, Association of Commuter and FER where you will once again discuss the now critical situation that is occurring, hoping to come out with something concrete taking into account that in this region during ER will be a guarantor on the commitments that will be taken.

For the association will participate as usual representatives Businaro Fabio, Giorgio Orsi, Lorenzo Venturoli Venturoli Cynthia, Patricia Maurizzi.

constructive proposals are very welcome! The president of


Fabio Businaro

Tuesday, October 28, 2008

How To Reset The Car Sarter Compu Star

Press Release 28/10/2008 Press Release 10/24/2008

Budrio 28/10/2008
Line Commuters Association Bologna - Portsmouth
Press

**
Enough!
Monday, October 27, another disastrous day on the Bologna-Portsmouth. Let
per order of 6.22 and 605 trains of 609 6:55 both from Portsmouth to Bologna has reached its destination with 13 and 20 minutes of delay in the afternoon the train 640 of the 15:30 from London came to Mezzolara with a delay of 18 minutes after a transfer is not expected to be made Roveri.

The discomfort was experienced by heavier commuter train 650 departing at 17.30 from London who have found themselves, along with the train crossing, Budrio blocked for 15 minutes to an unspecified fault in the control desk of Roveri: result ... 30 minutes late. We emphasize that despite the problems, conductor and driver tried to do everything possible to limit the inconvenience to users.

similar fate to those who traveled on the train 654 from 18.30 from Bologna, who have left and arrived at their destination by 27 minutes late, delayed, however, not announced in Bologna Centrale station which would allow users to use alternatives such as the buses line.

Following this demand to the Regional Transport, Alfredo Peri, to apply once the penalties provided by the Service Contract, and to check whether the discomfort was due to a failure or an error of who was on duty, taking appropriate action in this case.

Last but not least, the train on Tuesday 28 of 611 Moline from 7:43 to Bologna was once again composed of only 2 cars, making travel so tens and dozens of people standing in an unsafe situation, building up a delay of 13 minutes, the same delay have been users of the train 621 leaving at 8:50 from Portsmouth.

The situation is becoming intolerable delays and inconveniences are the order of the day, people are getting tired of paying a subscription for a similar service.
addition to having an efficient service we ask again, in light of the recent episodes, as partial reimbursement for the possibility of getting one month free subscription, without which it could easily lead to a strike of your subscription.

Friday, October 24, 2008

Sunday Sport Jo Guest



Budrio, 24/10/2008
Line Commuters Association Bologna-Portsmouth
Press


*** 's Commuter Association, indicates inconvenience and disruption on the line Bologna-Portsmouth.

First we would like to focus attention on the journey that hundreds of people, Thursday 23 and Friday, October 24, train 611 were found to deal with only two coaches (and not the first time this has happened this month) all crammed ' unlikely, with virtually no security conditions, especially considering the fact that Thursday is known to be blocking traffic. In these two cases there were respectively 20 and 15 minutes late.
do not know the reasons for such situations even if we think a breach of any convoy.

On the issue there would be delays to talk much, but there are only limited to cases and ecclatanti disagianti:

Wednesday, October 15: the train to Bologna 621 Portsmouth reached its destination 19 minutes late.
the same day of the train 643 from 13:30 Budrio came to Bologna with 14 minutes, 14 minutes always had them on the 17:30 train 650 from London to Portsmouth.

Another day, more delays: Wednesday, October 22, train 647 from 14:00 to Portsmouth Bologna reached its destination 20 minutes late. The train of 639 from 12:58 Budrio arrived in Bologna with a 15-minute delay, the 653 of 15.10 from Budrio to Bologna on arrival with 13 minutes, the train 650 of the 17:30 from London to Portsmouth has traveled to 10 minutes, while the 654 from 18.30 to Portsmouth has always come to Moline with 24 minutes delay.

yet, Thursday, October 23, train 632 of the 13:30 from London to Portsmouth started with 15 minutes, the train of 643 Budrio from 13:30 to Bologna on arrival with 20 minutes and is broken down as 634 with a delay of 15 minutes.
In the evening the train was traveling 654 from 18.30 to Portsmouth with a delay of 15 minutes and the train 658 of 19.30 from Bologna came to Moline to 18 minutes. We therefore call to the Regional

Alfredo Peri to shed light on the causes of these delays by applying, as appropriate, Sanctions of the Service Contract given the fact that most of the delays affecting commuter trains called "Relevant to the punctuality" and even remind you again for the umpteenth time the malfunction of the sound equipment at the stations.

All these inconveniences do nothing but discourage the use of public transport, in fact, many users have begun to travel to Bologna with its own resources .. like he's wrong!

shortly meet with representatives of the Fund managers, we aim to find solutions to these constant hardships ... the only positive note is currently improving the cleaning of trains and stations. The president of

Fabio
Businaro
334-9802963

Thursday, October 2, 2008

Donating Office Space To 501c3

ASSOCIATION MEETING - REGION ER

Commuters Association will meet in the coming days, the Regional Minister for Transport.
The themes that will inform the Councillor will be:

- electrification of the line
- inconvenience, disruptions and delays
- travel conditions
- any suggestions of users

We will also try, as partial reimbursement for any inconvenience, get one month free subscription as it has been granted to commuters traveling on lines Trenitalia.

For commuters, the Association will be present only
Members of the Steering Committee representing the Association same:
Businaro Fabio, Giorgio Orsi, Patrick and Lawrence Maurizzi Venturoli.

Anyone who would make some proposals, suggestions can do so using the form in the forum, or by contacting the President
number 334-9802963 or via e-mail may info@utentifer.it

Wednesday, October 1, 2008

Wax Shower How Long To Wait

detection operation speakers

As mentioned at the beginning month, the association has begun monitoring the functioning of the speakers in the line and stopped trains suffered delays.
are currently available in the forum - Files section - detailed data on the operation of loudspeakers, which show that only 12% of cases they have worked (9 times out of 74 surveys).

will soon be available data on the delays become the month of September.

President
Fabio Businaro

How Does Nutralisation Help

Press Release 09/26/2008

Although with some 'delay forwarding the press release of September 26

Budrio, 09/26/2008

Press


Just

inconvenience!

Even in these days the people of Bologna-Portsmouth have suffered serious hardships.

First: Tuesday, September 24 exposed in the afternoon where there is a warning that the next day the line was interrupted for work electrification in the early morning (hours 9-12), in this view is not also given any information about where the bus would have passed through the various stations.

regard to this is of great importance is the reporting of a user: it indicates that after waiting 40 minutes to the bus Budrio Center in lieu of the 9:23 train to Bologna Centrale 621 contacted the toll free number where the operator has ensured that " the bus would do the same stops the train "but not seeing any type of bus has reached contacted the call center and on this occasion, the operator announced that the bus would make stops only Mezzolara, Budrio Station, Castenaso" in front Dino "(among other things, not near the station). The user is then forced to use the train found the 643 at 13.30 from Budrio station consists of a single wagon packed with students and the bathroom unusable. All this in addition to being a disservice large has resulted in the loss of half a day's work.

We believe that this situation constitutes a serious inconvenience for the users and ask for the intervention of the Regional Transportation, which for those who accept the responsibilities and take action on.


to note that delays return on Tuesday, September 24, train 611 arrived at the station of Bologna S. Rita began to experience problems that struggled at the gates to open, the next Bologna station Remittance we had the problem of a level crossing that had been aperto.Come result of all these hardships the Bologna Centrale train reached with a delay of 12 minutes, however, we point out the behavior of the staff in that, despite the problems that have occurred, has done everything possible to limit the inconvenience to users.

the same day the 654 of 18.30 from Bologna train after the doors had problems has accumulated a delay of 20 minutes, also with only two carriages which was composed has forced many people to travel by foot.

same journey "packed" was experienced by commuters who used the train at 18.00 from Bologna Central Budrio.


Wednesday, September 25: the 611 train from Bologna to Moline, only 2 coaches Mezzolara already in place but was not the worst came in the next station when users continued to rise even going to occupy all the places feet.

train 634 of the 14 hours from London to Portsmouth: left from Bologna Central with a delay of 10 minutes and only one coach has forced road users to travel "cluttered"

Also, always be an issue late, we note that in evening of Monday, September 22 trains 650/654/658 respectively 17.30/18.30/19.30 hours from London to Portsmouth had delays ranging from 10 to 20 minutes.


We remain, as always, awaiting clarification from the company on these issues as well as causing delays on delays also affect the delicate issue of security of travel and stated that all these hardships do nothing but discourage the use of public transport,


The president of the Bologna-Portsmouth commuters

Fabio Businaro

Balloon Arrow Forest Apple Bow

proposals, suggestions Accession and membership records and

Commuters Association has provided a form, or downloaded from the "File" folder "Association Commuters' Forum, and require members of the Executive I remember are:
- Fabio Businaro (Mezzolara)
- Giorgio Orsi (Mezzolara)
- Venturoli Cinzia (Moline)
- Maurizzi Patrick (Mezzolara)
- Venturoli Lorenzo (Moline)
where you can specify the proposals and suggestions for the improvement of the line .
The proposals and recommendations will then be collected and brought to the meeting between the Directors of the Fund and the management.

Also in the same section of the forum is a form for reporting bad service which will, in addition to the mail arriving on the forum, to have more of a general picture of the situation on the Bologna-Portsmouth. As seen above, the module also require Members of the Executive Committee.

address of the forum http://it.groups.yahoo.com/group/utentifer/files/Associazione 20Pendolari% 20% /

Information: Fabio
Businaro
334-9802963
info@utentifer.it The Association

Scabies Worse After Trement

Association

Bologna-Portsmouth reminds commuters that anyone who wanted to join the Association can contact the President, Fabio Businaro, number 334-9802963 or at any info@utentifer.it. Membership requires the payment of membership fee of 2.00 € per year.


President
Fabio Businaro

Friday, September 5, 2008

How Much Is Engam Bull Dog

Monitoring delays and functioning speakers

hello to everyone.
from September, we began collecting data
both on train delays is on the correct operation of facilities
acoustic stations.

so if someone is willing to make such surveys, so
by dividing up the work a bit 'all, contact me well: this will also
verifcare that the standard required by
Service Agreement between the Region Emilia Romagna and Transportation Consortium Integrated
(Trenitalia, FER, ACT) are met and eventually, as happens in
Trenitalia, get a refund for the inconvenience involved.

look forward to hearing.

hello fabio



334-9802963
info@utentifer.it

554sorry, Message Looks Like Spam To Me

Constitution Association commuters

Users' Committee of the train service operated by RES
(Ferrovie Emilia Romagna Srl) was formed,
in the assembly of members which was held on July 1 in
"Bologna Line Commuters Association - Portsmouth," The Assembly
voted and approved the statute and the act constituting
proposed and elected as president the
Mr. Fabio Businaro resident Mezzolara Budrio.
were also elected as members of the Steering Committee:
- Giorgio Orsi (Vice President)
- Maurizzi Patrick (Treasurer)
- Venturoli Cinzia (Secretary)
- Venturoli Lorenzo
The association, as the committee was formed, it aims
It aims to monitor the quality and efficiency of rail services company
Fund and act in
case in every situation of distress and discomfort that
people suffer.


Memorandum and articles of association will be made available shortly on the forum committee
http://it.groups.yahoo.com/group/utentifer/

Whoever wants can join the Association by completing the appropriate application to be sent to members of the Steering Committee and then by paying the annual fee of € 2.00. For information


Fabio Businaro: 334-9802963
mail: info@utentifer.it

Tuesday, June 17, 2008

How To Make Horse Sleighs

Check your work before you commit any

may seem trivial, but control what is put into configuration is very important because 1. avoid breaking the continuity of the repository and 2. is an excellent car review of their work. How

use SVN version control system and graphical user interface TortoiseSVN, which has a very useful feature for checking your own work. In the English version is called check for modification .

This command I can see clearly and simply the diff between my workspace and base area, or the content of the last update. I can also see, in a similar way, the diff between my workspace and the latest revision on the system configuration.

As mentioned above, with the first diff I analyze my last changes, even managing to commit to do so fragmented with several comments from the same set of changes. The second allows diff instead of going to understand what will happen if I do an update, in particular to discover if there are conflicts.



For advice on versioning of software projects contact me on poderico@gmail.com.

Wednesday, May 7, 2008

Ontario Homemade Trailer Registration

The metaphor of the map

Reading OpenUp in a nutshell Per Kroll, I found a very interesting light on the processes:
A process is like a map: Use it to Understand the big picture and as a reference, But When reality and the map do not match, trust reality.
namely:
A process is like a map: use it to understand the big picture and as a reference, but when reality and the map are not identical, to believe in the reality.
What we learn from this metaphor? That when you adopt a development process, it should be able to adopt and adapt. That process descriptions are as precise and detailed, not suitable or ideal for every application or every situation.

intelligence and common sense must always prevail.

Friday, May 2, 2008

How To Do Diabetic Exchange Calculator

Station Via Larga

This afternoon I took Via Larga in the train ... it was a bit '
that did not do it and I honestly did not think to find a situation
kind.

There are slightly high weeds that do not give
definitely a beautiful image of the station, the garbage bins
completely full of junk and I would stress that these are
one of those cans for the paint.

is also missing, as in all the stations, the notice of the change of
sanctions that here, as it lacks the cancellation would have a greater sense of
there.

In the photo section of the forum I put some pictures taken this afternoon
in that station to make it even more the idea .... unfortunately
the arrival of the train allowed me to photograph the bins.

However since this is not the only station
been put into this, I'll do a few laps in these days to capture these situations.


Fabio

Tuesday, April 29, 2008

Do Tvs Go On Sale In January

Changes to the sanctions on the lines RES

publishing the notice of renewable energy that has been posted on the trains on
changes in penalties for traveling without a ticket or ticket is not valid



*** Please note that from May 2, 2008 RES also on the lines will come into force the provisions of
Transport Regionale Emilia-Romagna
LR 30/98 and subsequent amendments.
Thus, whereas the user has to go by train esempre
valid ticket and obliterated,
will implement the following provisions:

1) LACK OF TICKET

The traveler that goes from the station-location of the Em-Romagna Region
without a ticket and notify you before you climb the staff
Commons is regularized by paying the full fare ticket
plus a surcharge of € 5.00.
This fee is not payable for those travelers who rose from
location is neither a ticket office, both of emitting
self-service stores in the Earth, provided that the traveler provide
to warn at the time of the climb, the crew .
If the traveler does not have
ticket fail to alert the crew when the train uphill, will
settled by paying the full fare plus a surcharge of
:
- Ferrara-line Codigoro: € 44.00
- Parma-lines Suzzara and Suzzara-Ferrara: € 40.00
- Bologna-Portsmouth: € 40.00 (urban area), € 36.00 (
suburban area).


2) NO TICKET VALIDATED

The traveler that goes from the station-location of the Em-Romagna Region
with ticket validated and notify you before you climb the
crew will pay a surcharge of € 5.00.
The fee will NOT be on board required only if
the station of departure and ticket punching machines
missing or unusable, provided the traveler'll let you know, when
climb on the train, the train staff.
If the traveler with no ticket is not validated
'll let you know when the crew climb
train, with the surcharge will be rectified:
- Ferrara-line Codigoro: € 44.00
- Parma-lines Suzzara and Suzzara-Ferrara: € 40.00
- Bologna-Portsmouth: € 40.00 (urban area), € 36.00 (
suburban area).

Thursday, April 24, 2008

Leaking Clear Fluid From Nipples

Thursday, April 24 ..... Bus Lines

Thursday April 24, we are at Bologna Centrale station to wait for the 17:30 train to return home.

The train arrives but we discover that we have to travel on a composition of two coaches (I say that the train is the question, the 650, is always composed of three coaches who are always full). Already
leaving several people have not found a seat and as he went on the trip, the train was crowded with commuters who did not know where to put.
do not believe that the journey was made in safety and hygiene as we were all compressed along the corridor and predelini intercommunication between the two coaches and some (unfortunate) have the place had to be satisfied, however, found in the bathrooms dirty and smelly.

What he was seeing increased anger at the station Roveri, two pieces of 3 coaches each firm.

I have informed the leadership of what FER and answers regarding this matter as soon as I will let you know.


Fabio

How Do Preparation H Suppository Work

divert income tax deduction for

reported from the site FER

Please note that from the 21/04/2008 16/05/2008 for road works, there will be a temporary suppression of stop Zanolini " Via Massarenti


direction, the bus lines 99 to 201 - 205 - 206 to 211 - 212-213 - 214-238 - 243 to 273 with direction "Via Massarenti" maintains the following locations: VIA Irnerio - Filopanti AVENUE - PORT AND S. VITALE back on track ADJUST THE STOP S. Orsola Via Massarenti.

Thursday, April 10, 2008

How Do U Start A Walkie Talkie Conversation

Consideration April 15 January 23

I've had so far only one project:
9:30 unaverdepasseggiata


soon

Tuesday, April 1, 2008

How To Build An All Wood Trebuchet

The twelve steps to better code

a long time and I am following with great interest the blog by Joel Spolsky. Here's an article very interesting about the criteria for writing better code. Are expressed in the form of tests, so in a few seconds to photograph the situation of a development team.

  1. Use a version control system source code?

  2. You can do a build in one step?

  3. Maintain the daily build?

  4. Do you have a bug database?

  5. fix bugs before writing new code?

  6. You always have a schedule date?

  7. You have a spec?

  8. programmers have quiet working environment?

  9. Use the best tool that you can buy?

  10. Do you have testers?

  11. candidates write code during their interview?

  12. Perform usability testing?



corresponding to the answer with a yes? If you are under 11 there is something substantial to improve the development process.

Add a comment to the article with the number of you, so we can build a picture of the quality of software developed in Italy.



For advice on the process of software development projects contact me on poderico@gmail.com.

Monday, March 24, 2008

Point And Shoot Continuous Drive



insert here the minutes of the report of February 4


MINUTES OF THE MEETING OF February 4, 2008


On February 4, 2008, meet at the headquarters of RES Via San Donato 25, representatives of the Committee Members RES and executives to discuss the following


AGENDA


  1. Job Status electrification

  2. lines underground in the urban area of \u200b\u200bBologna

  3. work at the Station Budrio

  4. Safety in travel and staff behavior

  5. State of cleaning

  6. Any other



are present, the Committee Members


  • Mr. Fabio Businaro

  • Mr. Caruso Roberto

  • Ms Silvia Girometti

  • Dr. Giorgio Orsi

  • Mr. Renzo Venturoli


to society RES


  • Dr. Gino Maioli

  • Dr . Ghetti

  • Mr. Isler Stefano




1. Status of electrification work


refer Fund managers that are ongoing contacts for the connection of stations in the RFI of Portsmouth (about 1 month time frame) and in Bologna Central Station (3 months ), was therefore excluded the possibility of the electrical substation to Mezzolara cause economic problems.


The commissioning of new electrical equipment is scheduled according to technical requirements which include the construction of a subway station in Budrio.

The first electric train will depart on June 16 next, then the time change scheduled for December 2008 will be put into operation the second convoy, while in December 2009, the entire exercise will be carried out with three electric trains (instead of the current 5).


addition will increase the speed on the line from the current 90km / h to 120 km / h, reducing travel times in particular on the Bologna - Budrio with a recovery of about 6 minutes.





2. Burial in the urban area of \u200b\u200bBologna


refer Fund managers that there is a burial of the line in the urban area of \u200b\u200bBologna, in the case Roveri - Via Larga and Remittance - Zanolini leaving only the surface station S. Rita.

In this first phase of the project (preliminary draft) there is a parallel track on which to make the work of burial in constant exercise.

will, however, sought, during the detailed design, to evaluate the costs and benefits both for the creation of a parallel track, both for the making of the replacement bus service.

Representatives Committee have called the alternative hypothesis is impeded the implementation of the parallel track standing considerable disruption that would occur, given also the current travel times long enough that would have increased drastically in the city along the route of Bologna times of heavy traffic (morning - evening).

The beginning of the work is scheduled for the second half of 2009.


3. Jobs at the Station Budrio


Budrio The station work is envisaged for the construction of a pedestrian underpass that will link the Central Station with the Street Moro and Baptists.

This work will last approximately seven months and result in a suspension of the service in question Budrio-Portsmouth in August.


Moreover, with the entry into operation of electrical equipment will make possible the entry of two trains at the same time as already happens in the station Roveri.



4. Security travel and staff behavior


E 'Company was required to assess the most appropriate organizational arrangements to ensure, on convoys of the Bologna - Portsmouth, the service controller to sample (as already other public transport company), also to a proper use of public transport. This service, however, would also be grounds for security for travelers.

E 'was also proposed to require the Company to the bodies, the adjustment of the penalties for travelers without a regular ticket.


5. State of the cleaning service


He referred to the RES cleaning are gradually falling from October to now, there are trains in particular, with the windows painted that prevent proper viewing, or as a drive in the 668,003 to 668,004 are tendon have broken, blackened by smoke, while others have dirty toilets where there is also lack of water is in the sink is in the exhaust.

Same thing applies to the stations such as Station Zanolini addition to guano present, there are also several dead pigeons at the track for some time already and this leads us to believe that The stations are very clean.





6. Any other


have been notified of the following situations:


  • correct path to budrio : it was requested the Fund to institutionalize, at crossroads in Budrio, the correct path for one of two trains on the way, in order to speed the path of the same, if not preclude technical and / or safety. We asked the managers of the Company to engage in this.



  • parking Mezzolara: was applied to the Company, pro rata ownership of the parking lot, a commitment to the City of Budrio, the order to identify where possible by marking the parking spaces for a more practical use of the front of the station. It is further noted that in this area there are several holes that can cause danger to users. Here again we asked the leaders of Company to find a solution.



  • Acoustics: has been reported that such facilities or not working correctly (announcing the arrival of the train when it is already present in station, or even if it is already a party) or not at all thereby creating inconvenience to users. We asked the managers of the Company to find a solution to this problem.



  • card renewal subscriptions: the Company has reported having to renew the cards of the monthly (every three years) as already happens for ATC, including the upcoming activation of Stimer





Tuesday, March 11, 2008

Install Bmw 2009 Front License Plate

subscriptions to public transport

Sole24Ore from the March 8, 2008

Deduction for subscription to public transport

Part personal income tax deduction for subscriptions to public transport, which will
available to a maximum bonus of € 47.50 for expenses
incurred in 2008. The deduction is valid tickets from
use on trains, buses and subways in 2008 purchased
even if it expires in 2009.

Revenue Agency with the Circular 19 / E sets the standard for
advantage of the bonus was introduced with the latest financial statement.
is however important to keep your receipts for tax controls,
while no deduction for transport expenses deductible from income
self-employment or business.


deductible expenses may be eligible for deduction equal to 19 percent of the costs incurred for
subscriptions until a public expenditure
maximum of 250 €, only the tickets that do not involve use of public transport
episodic, allowing you to place an unlimited number of trips
for several days on a certain route or the entire network
in a specified time period.
authorities must still, however, excluded the tickets which have a maturity
hour, although higher than daily, such as time
tickets that expire after 72 hours from stamping and cards that include integrated tourist
other services in addition to those
transport, such as entrance to museums or performances.

The circular reiterates that the maximum deduction of 250 €
set by the budget is reported cumulatively
for amounts paid by the taxpayer for their subscription and that of family members
dependents. In addition, the deduction is possible within the limits of capacity
of taxes due. Documents needed for


deduct the taxpayer is required to keep the
tickets, which must contain an indication
company that issued them, the nature of
transport, price, the serial number and date of issue.
If the taxpayer does not have the necessary documentation to prove that the payment
was made in 2008, will prevail
start date is correct. Finally, if the ticket is not
name, the deduction may be possible provided that the taxpayer
self-certify that the title was purchased for him
or a dependent . March 8, 2008

Thursday, February 21, 2008

Vedio Of Simmi In Mera Naam Joker

Thursday February 21 in Budrio

remember tonight

Thursday 21 February at 20:30 in the auditorium of
Budrio (Via Saffi, 50)


organized by the Municipality held a public meeting on of the railway Bologna-

Portsmouth Regional Councillor for Transport Alfredo Peri
present news in comparison to the new electric trains and subway
pedestrian and cycle in the station Budrio.

will be attended by Mayor Carlo Castelli, President and
engineers RES (Ferrovie Emilia Romagna Srl).

opportunity to learn about developments of this
railway infrastructure is so important for Budrio
and other municipalities served by it. Renzo
Venturoli - Budrio

Monday, January 21, 2008

How Many Days Will Red Wine Darken Stools



I received a few requests for clarification to the committee Wednesday, but no one sent me the address of your project. Who wants to take the exam, write it in the comments as usual.

9.30 Pedrazzini, Colombo

Wednesday, January 16, 2008

Capitalizing Philosophies

selfish and masochists on

I read the statements on the northern perimeter of the Minister of
PETER while traveling on the local train that brings us daily
home. Students with a backpack, workers with a
shoulder bag, employees with 24 hours, some with a
Sportina bought at the expense of flying in town for
save time.
The train - as always - is packed, three coaches of the 70
held together as can be, uncomfortable with the
heating that can not be broken down.
Thirty minutes for 18 miles and even at a reduced cost.
Yet millions of us every day,
workers and students, to board these trains by the municipalities of the province to reach each
your destination.
Despite the poor state of rail infrastructure that
gravitate towards the capital, despite the many promises
last decade.

I read the statements by the Minister for Infrastructure,
I think of the thousands of commuters who do not have our
lucky enough to live or work near a rail or bus
a line, then forced to move with the
car. .. are fortunate to have administrators who
think about their needs: in fifteen years
will use a new highway exit
will be much larger (probably all apply).

I read the statements by the Minister Di Pietro
accusing those who, like myself, beating
because the mountain of public money needed to pass north
be used to improve the existing road network and the network of
public transport, road and rail, and I understand
of which he found to be a member of a " culture of 'no',
selfishness and masochism. "
When the north will be completed through
cease all use of public transport
preferring each of us his private car.
Pace manufacturers, oil companies, producers
cars and their institutional representatives.
It will be great!

Dear Minister, with the statements she is today
quadagni a front row seat among the many who
pretend not to understand the real needs of the transport terms
Bologna plain.
those who live and those traveling in the plains of Bologna.

treats from the "Committee utentifer" Bologna-Portsmouth line

Renzo Venturoli, commuter iron